Brighton MDU Ponderosa Relocation Project

The purpose of the project was to construct new modular accommodation consisting of offices and welfare facilities for the Brighton Works Delivery Team at the Combined Engineering Depot (CED), and to facilitate their relocation from their existing home at the Ponderosa.   The facility was designed as two stacked prefab [...]

By |2017-02-13T15:59:13+00:00August 2nd, 2013|Rail|0 Comments

Victoria Station Facade Clean

Victoria Station is the second busiest railway terminus in the UK.  Originally Victoria Station was a combination of 2 railway stations which merged in the 1850’s when Victoria Station named after Victoria Street (not Queen Victoria) became known as the Southern Railway Company. The Kent side buildings were constructed of Portland stone with a [...]

By |2018-03-20T15:14:16+00:00June 6th, 2012|Rail, Special Works|0 Comments

Tottenham Hale Toilet Refurbishment

Spence have undertaken the design, reconfiguration and refurbishment of the ladies, gents and disabled toilets on Platform 2 at Tottenham Hale Station. This was a flagship project for both Spence and Greater Anglia. It incorporates the Greater Anglia corporate colour scheme and specifications which has determined the way forward for all future developments/refurbishments. [...]

By |2018-03-20T15:52:12+00:00February 2nd, 2012|Interiors, Rail|0 Comments

Boots Unit, Waterloo Station

The Boots Unit at Waterloo Station is located between platforms 11 and 12 and stands as one of the largest buildings to have been constructed in recent times on a station platform. The scheme was undertaken with the intention to enhance the revenue stream at Waterloo Station.   In order to [...]

By |2018-03-20T16:00:30+00:00January 17th, 2012|Commercial Property, Interiors, Rail|0 Comments

Arch Refurbishment

Stewarts Lane, Battersea, consisted of a large number of period railway arches of varying sizes with a planned redevelopment to upgrade the site into a flourishing retail and industrial centre. The area to be refurbished initially consisted of nine arches, seven relatively small 3m high units and two large units up to 8m in [...]

By |2018-03-20T16:08:11+00:00February 22nd, 2011|Commercial Property, Interiors, Rail|0 Comments
Go to Top