News

Sussex and Kent Relight and Rewire

Spence have been awarded a relight rewire scheme for client Network Rail across Bearsted, Eltham, Sidcup and West Croydon stations. The scheme will aim to improve the electrical circuitry at these locations which is currently out of date and in need of renewal. The works are now in design phase and we look forward to [...]

By |2020-11-26T09:25:44+00:00November 26th, 2020|News|0 Comments

Waterloo, Clapham and Guildford Toilets

Spence are pleased to announce that we have been awarded works by Network Rail to undertake a substantial toilet refurbishment across Waterloo, Clapham and Guildford stations. The new facilities will provide superior fixtures and fittings and technology to meet modern standards at the three locations. After a challenging few months for everybody, it’s great to [...]

By |2020-11-19T09:55:22+00:00September 10th, 2020|News|0 Comments

Brixton Triangle

Works are now complete and Brixton Triangle Arches where Spence have undertaken an extensive £5m refurbishment of the viaduct, creating new and enhanced retail space in Brixton. The renovation included the units within the arches and the space between the arches, creating a new thoroughfare with kiosk units between Brixton Road and Atlantic Road. The [...]

By |2020-11-26T09:30:41+00:00February 2nd, 2020|News|0 Comments

Crown St. Arches

Spence’s civils works are now complete at Crown St, Camberwell where an access roadway has been created between a new residential development, which is currently incomplete, and the Network Rail Arches. The works have included the installation of surface and foul water drainage, local district heating pipework infrastructure and various service ducts below ground. In [...]

By |2020-11-19T11:23:20+00:00July 1st, 2019|News|0 Comments

Arch Inspection Update

Spence’s Maintenance Team have closed out a fourth year of arch inspections with a 100% completion rate, gaining praise from client Network Rail. Forward planning and teamwork between all parties, including the tenants, means that a total of 92 arches were able to be completed with 2 more vacant arches ready to be inspected in [...]

By |2018-04-12T16:09:17+01:00April 12th, 2018|News, Uncategorised|0 Comments

Contract Award at MacMillan House

We are pleased to announce that Spence have secured the above contract for The Office Group. The project aims to refurbish the 4th Floor, Block A of MacMillan House at Paddington Station to be used as offices. Works have already started on site with a fast track programme and completion in early May. The works [...]

By |2018-03-19T12:19:01+00:00March 14th, 2018|News|0 Comments

Genelec Experience Centre

Take a look inside Source Distribution’s new Genelec Experience Centre. Spence have recently completed works at Wells Street, London for Source Distribution’s new Genelec Experience Centre. Works consisted of a complete refurbishment on the lower level to create a space dedicated to the Genelec range. Upstairs, Spence undertook an office fit out along with a [...]

By |2018-02-27T12:04:42+00:00February 26th, 2018|News|0 Comments
Go to Top