Liverpool Street West Mall & Broadgate Link

Spence were commissioned to undertake a shell and core specification fit out at Liverpool Street Station, revitalising the West Mall and Broadgate Link. The aim was to upgrade the listed station, carrying out an internal strip out and fit out to the retail units to provide the station with a consistent and harmonious retail presence. [...]

By |2024-02-12T12:04:00+00:00February 12th, 2024|Commercial Property, Mechanical & Electrical, Rail|0 Comments

Clapham Junction Staircase

Spence is currently in the design development stage of a particularly complex project in the heart of London at Clapham Junction Station. The brief is to design, supply and install additional escape capacity (up to 2000 per minute) to the Grant Road elevation of the existing station. Project Value: £170k design [...]

By |2022-08-23T10:31:33+01:00August 19th, 2020|Rail, Special Works|0 Comments

Blackhorse Road Ambience Project

Spence have completed works at Blackhorse Road Station, with a refresh of the entrances and ticket hall area having been undertaken and new external cladding installed. Project Value: £800k Programme: 5 months Form of Contract: NEC3 Client: TfL Key Trades: Electrical / Ceilings / Cladding / Steelwork / Cleaning / Paving / Handrails / Tiling [...]

By |2022-08-30T14:15:00+01:00February 26th, 2018|Rail, Special Works|0 Comments

Union St. Arches and Devonshire House

Devonshire house is a 3 story brick building that connects to a row of Victorian arch viaducts. The building and the arches were in a distressed state and required regeneration works. Unknown to the client, Devonshire House was in a structurally unsound state. By working closely with its onsite engineering [...]

By |2018-03-20T14:13:08+00:00April 23rd, 2016|Commercial Property, Rail, Special Works|0 Comments

Bishops Stortford Railway Station – Modernisation Project

The previous Railway Station buildings were constructed over 50 years, being bolted together and amalgamated leaving a disjointed array of building styles. From the very start of this project, Spence’s vision was to remove the existing facilities, and replace them with a fresh, modernised innovative building that would incorporate enhanced facilities, that could be [...]

By |2017-11-09T15:15:50+00:00January 30th, 2014|Rail|0 Comments
Go to Top