.

About

After 20 years in business, there's plenty to talk about. Get an insight into how our employees, projects & departments work together to create the level of standards that has led to the 2 decades of success we've been able to enjoy in the industry.

About

Sectors

Understand how the 4 main sectors we cover - Rail, Retail, Commercial & Healthcare are fundamental to our brand identity. Delve into the details of what the works include and why we offer them.

Sectors

Services

As part of our business portfolio, we have experience in many services. Meaning, we offer design & build, Refurbishment, Fit Out works, M&E Infrastructure & New Build. Find out more about what this means and how we can meet your needs.

Services
London Bridge Western Arcade
Overview

Spence delivered the full design and build upgrade of arches SU16 to SU19 at London Bridge Western Arcade.

The works were undertaken to align with the standard and finish of the adjacent arches, which were previously refurbished as part of the major redevelopment of London Bridge Station.

Scope
  • Full strip-out of existing arch units back to shell condition to create a flexible base build for future tenant use
  • Installation of new drainage infrastructure throughout to support anticipated retail and commercial demands
  • Application of Pudlo waterproofing system to arches and supporting columns to mitigate water ingress from track bed above and improve long-term durability
  • Installation of bespoke anodised aluminium cladding system to conceal waterproofing works and enhance internal finishes
  • Integration of a services support framework within cladding to allow tenant fit-out flexibility
  • Upgrade of incoming electrical supplies to accommodate increased retail loads
  • Provision of new water supply infrastructure across units
  • Installation of connection points for fire alarm, PAVA and BT services to enable straightforward tenant integration into base building systems
Challenges & Solutions

The site was located within a busy thoroughfare at London Bridge Station, requiring logistics to be carefully planned and tightly managed.

Due to the high volume of pedestrian movement and live station operations, works were meticulously programmed to minimise disruption.

This involved close coordination with the Station Team to manage access, deliveries, working hours and safety controls, ensuring that construction activities were carried out safely while maintaining uninterrupted public use of the station.

01 · 03
02 · 03
03 · 03
01 · 03
02 · 03
03 · 03
01 · 03

Let’s work together
We believe the best results come from collaborating with passionate people. Whether you have a vision or need guidance, we’re here to help transform challenges into opportunities. Let’s start the conversation and bring your aspirations to life!
Let’s talk